Dingli signed the contract of supply of 11-meter public lighting steel poles with an Ecuadorian customer on June 2, 2020. Till now, the batch of goods has arrived at the customer's warehouse and has been successfully accepted.
The project was signed in early June. In spite of the impact of the epidemic, Dingli completed the processing of the goods and shipment to the port of Ecuador designated by the customer within 60 days, ensuring the customer's construction period. At the same time, the outer packaging of the steel poles is protected by a double layer of plastic film and mops to ensure that the product is not damaged during transportation.