Project Name:DISI Station of 132kV Substation Equipment Total Package Contractor of Jordan State Grid
 
Product:Substation Steel Structure
 
Project Summary: The substation is of particular importance to Jordan as it is a key component of plans by the National Electric Power Company (Nepco) 
to upgrade the country's transmission system. Electricity demand is forecast to grow from a peak load of 1000 MW in 1997 to around 1900
 MW in 2010 and it has been recognised that to maintain reliable supplies during this period of growth, a 400 kV transmission system 
will be needed in place of the existing 132 kV one.